SMRA held a successful drop in event in the Village Hall on the 3rd October, advertised through a variety of media as ‘Have Your Say’, offering the opportunity to raise concerns or ask questions on any aspect of village life.  What those organising the event couldn’t answer, SMRA committed to passing on to those who can.  This report identifies all issues arising that SMRA could address and the response they made.

There will be further significant community consultation on the detailed design of the new village hall, the pitches and informal sports areas on the Bell Gardens Field and the opportunities this gives the village to provide a better range of services and facilities.

SMRA Item raised

Discussion at the Meeting or SMRA response

Action

Various comments about lack of activity items for older age groups, though the Motoric Track had some interest. Zip wire hadn't been considered, despite being asked for.


Climbing Wall, Skate Park, Pump Track, Street Art/Graffiti Wall

Play equipment suppliers had informed us that a zip wire was not suitable for the current location, however we have earmarked it as a potential for the new teen play area when it comes, along with a list of other potential older aged attractions.


Also pointed out the new item (Motoric Track) contained many of the items the older age groups had requested such as monkey bars and hoops.

Responded /future consultation

Exposed nature of Teen shelter, though positive about the teens having their own area

Discussed the SMRA planned tree and shrub planting due to start soon around the shelter for wind, rain and noise protection. A clear tarpaulin was purchased and installed as a temporary measure for this winter.

Responded /actioned

Kickabout area too small, goals too narrow for diving

Informed that feedback on the now revised kickabout size had been positive and that the goals were being widened following feedback.

Responded /Completed

Running track - Youths keen on athletics and want a 100M running track marked on the Rec

The potential to retain part of any school sports day running track markings across the adult pitch during off-season was agreed. Potential for a permanent running track as part of the new Village Centre.

Agreed /future consultation

Impact of new path when winter comes and the hedges lose their leaves. Privacy issues looking into people’s gardens

Discussed proposed landscaping on boundary, hopefully to be planted soon, shrubs and trees should provide additional privacy and noise reduction.

Responded

Lack of engagement/ communication with neighbours on Rec plans and other works going on in the village

Accepted. Committed to leafletting our neighbours for future rec works and events. Semi-regular drop-ins to be arranged for better engagement.

Responded

Potential to move the Gym equipment away from the school into a more private location so thoseuncomfortable exercising in public can feel more comfortable

No suitable location exists under our control at the moment that will not cause neighbour complaints or be dug up in the short or medium term. Could be considered, if confirmed by design consultation on the new Village Centre.

Responded /future

consultation

The Rec plans keep changing without any updates or consultation with Neighbours, every time the plan is seen there are differences

Plans are continually evolving and were shared in various stages of development from May onwards. There were two late changes in the last few weeks caused by the relocation of the Witches Hat and potential for assistance with those costs from the Harris Trust.

Responded

Willingness to make a sizeable charity donation to have play equipment relocated, including a willingness to pay for lost income
from losing the youth football pitch to allow play equipment to be moved into the vacant space

Would not consider a donation unless it did not compromise the layout of the Rec or range of equipment provided and was to the benefit of all residents. Sports England would not allow us to lose the Junior pitch which is intended for both hire and school use and will, during the period of construction of the Hall and expanded Rec, be the only
football pitch available.

To be responded

Height of the tops for the new equipment are too high causing invasion of privacy if children climb on top; ask if the manufacturer can
offer solution

The manufacturer has been consulted. However, the customising they offered was restricted to the play equipment attached to the towers and not the towers themselves which are likely structural.

Responded

Request to move some or all the play equipment to be close to the new
village centre once it is delivered

Could potentially be considered in the long term if consultation confirmed that was acceptable.

Future
consultation

Several concerns raised about the compressed nature of the play and sports areas with everything
squeezed into the middle. Several comments about neighbours living next to a Rec shouldn't complain

Explained our design took into account and attempted to minimise neighbour nuisance, whilst delivering the most appropriate and best value play equipment.

Responded

2 basketball hoops instead of 1

Second hoop at the current location would be a significant neighbour nuisance. However, BB court is a potential
addition within the sports area of the new Village Centre.

Future
consultation

Bike repair station requested

SMRA Supportive in principle - Investigate for new VC?

Future
consultation

Bike lock ups requested

SMRA supportive of bike lockups for when the Rec becomes cycle friendly (School Expansion work and Rec expansion
with cycleways).

Next phase plans

The path from THR gate to the
preschool and beyond is not suitable for the volume of footfall, it is uneven and unsafe for pushing buggies and children’s scooters/bikes. Frequent accidents of children falling off.

Unlike other footpath repair queries which is SBC, this is 100% parish council and will be passed on to them.

pass onto PC

The school temporary car park will be too far from the current village hall for those going to the Friendly club. When the new village centre is delivered access will be difficult, especially for coach pickups - could spell the end for the club

Out of school hours community parking will be available where the current car park is now. Accept that daytime
activity for the elderly may mean a longer walk from the car park to the current village hall, but there is little that can be done if the school expansion is to go ahead. In the longer term, daytime activities will be at the new Hall where coach pickups are feasible. Some potential for an additional pick
up outside the school for those unable to walk on foot to the new Centre.

pass onto PC

More litter bins especially by the teen shelter and football pitch

Litter/dog bins require road access in close proximity for the collection vehicles. SMRA to recommend relocation of the pair next to the school car park to where the new ROW
crosses onto OVL. Recommend purchase of at least one
further set to service Magdalene close.

pass onto PC

Back to top